Kitchens and bathrooms

Kitchen and bathroom renovation in Barbados

These are the two rooms people judge a house by, and the two rooms most often ruined by sequencing. Six trades have to follow each other in the right order in a small space. Managed properly it is three or four weeks. Managed badly it is four months of waiting for someone to turn up.

Kitchen with a stone island, timber stools and doors open to a sea view

Run as one job, not six phone calls

When you hire trades separately you become the project manager, and every gap between them is your problem. We hold the programme: the plumber knows when the tiler is coming, and the units are on the island before the kitchen is stripped out.

  • Strip out and safe disposal
  • Alterations to layout, including removing or forming openings
  • First fix plumbing and electrical, including moving services properly rather than extending them badly
  • Waterproofing and tanking to wet areas — the step most often skipped
  • Screeds, falls to shower areas, and tiling
  • Kitchen units, worktops, splashbacks and appliance installation
  • Sanitaryware, second fix, sealing, painting and making good

Where bathrooms fail in this climate

Almost always at water management, not at the tiles. If the shower area is not properly waterproofed behind the tiling, and the falls do not actually run to the drain, water gets into the structure and comes out somewhere else — often on the other side of the wall, months later. Tiles hide it for a while. Then they do not.

We tank wet areas, form the falls before tiling rather than hoping the adhesive bed will do it, and use the right sealant in the right joints.

Kitchens: order early

Island lead times are the thing that catches people. A kitchen ordered from overseas can take weeks to arrive and then arrive with one cabinet damaged. We work backwards from the delivery date, and we do not strip out a working kitchen until the new one is here or confirmed.

How long you are without it

A straightforward bathroom: around two to three weeks. A kitchen: three to four, depending on units and worktops. We give you the dates, and where possible we keep a temporary sink or a second bathroom working.

Worth spending on

  • Waterproofing behind the tiles
  • Extraction that actually vents outside
  • Decent taps and mixers — cheap ones fail fast in hard water
  • Solid worktops and hinges
  • Enough sockets, in the right places

One quote, one programme

Itemised, with the sanitaryware and units either supplied by us at a stated allowance or supplied by you and installed by us. Both work. Being vague about which one is what is where budgets slip.

Price my kitchen or bathroom

Common questions

Can I supply my own kitchen or sanitaryware?

Yes. We will install what you buy, and we will tell you before you buy it if something is going to be a problem to fit or to service later.

Do you move plumbing and electrics?

Yes — properly, back to the source where it needs to be, rather than adding another extension to a run that is already too long.

Will you take the old units away?

Yes, disposal is included and stated in the quote.

Talk to the builder who will run your job

Tell us what you are planning. You will get a straight answer about whether it is a job for us, roughly what it involves, and what happens next.